Explore how Inline Logistics has built tailored solutions for our clients, creating efficient, high-performing warehouses and distribution centres.
For over 50 years Inline have successfully completed Turnkey fitting out projects for their clients on time, on cost, and to exacting standards globally. Many of our corporate clients have been with us for over 25 years. Our coordinated design solutions ensure services clashes are eliminated and integrated with storage systems, mezzanine floors, offices, office furniture, sprinklers, electrical, power and lighting, smoke detection, data cabling and all ancillary requirements.

A small selection of completed projects are shown below.
3D rendered warehouse layout with storage units
Project Motion
  • 450,000 sq. ft. Automotive central warehouse in Wolverhampton completed in 2024
  • Multi-tier shelving installation with sprinklers, lighting and smoke detection
  • Goods lifts serving multi-level mezzanine floor
  • Wide aisle racking for palletised goods and for picking with low level order pickers
  • Narrow aisle racking for palletised goods for increased density of storage for pallets in and pallets out
  • Flammable store fully sprinklered and within mesh enclosure – accessed via rapid shutter door
3D model of a large warehouse storage system
Project Phoenix
  • 250,000 sq.ft. Central warehouse in Northamptonshire, turnkey project including sprinklers, lighting, power, pallet racking, mezzanine floor, goods lifts, carton live storage, shelving, pallet live storage completed in 2022.
3D warehouse model with delivery trucks and conveyors.
Project Main Stream
  • Automated warehouse project in Rugby for Pearson Shared Services completed in 2003
  • 55,000 pallets in pallet racking, served by automated cranes
  • 30,000 tote live storage locations in mini-load system with multiple walkways integrated into rack structure
  • Single tier shelving for slow moving titles
  • Pallet live storage for new title releases
  • Value £18.3m delivered on time on cost
  • Inclusive of all services, sprinklers, lighting, power, battery charging / changing system
Warehouse logistical floor plan with detailed sections.
Project Spice
  • 650,000sq ft central warehouse in Staffordshire completion in 2021. Turnkey fit out including Schedule B base build works.
  • 50,000 pallet racking locations.
  • 5,000 carton live storage locations on 3 tier mezzanine floor of 3,900 square metres
  • 3 tier mezzanine floors for the automation conveyors, each level 6,028 square metres
  • A single tier mezzanine floor of 1,242 square metres for automation despatch conveyors